Details: earth work in excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.all kinds of soil. providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. supply of stone boulder (nallah) centring and shuttering including strutting, propping etc and removal of the formwork. a) foundation, footing, base of columns etc. carriage of construction material sand by mt / at 55/4 km carriage of construction material baajri by mt / at 55/4 km carriage of construction material stone by / at1.00 km carriage of construction material cement by / at4.0 km add cib
Sector: RDPR