Details: design, fabrication, and commissioning of 3 ton capacity gantry for loading and unloading of electromechanical equipments at intake-i sitlee. job includes earth work excavation for all kind of soil in trenches of 0.70mx0.70mx0.90m- 2 nos. at distance of 2.43m and disposal of the excavated soil to a distance of 50 mtrs. approx. laying of rcc foundation block in the excavated soil in ratio m-15 grade (1:2:4) - 2 nos. providing and fixing of ms plates of size 400mm x 400mm x12mm with anchoring of 25mm dia heavy duty foundation bolts 0.75m in length ( 4 nos. for each plate ) for strengthening of each vertical piers/ column in proper alignment. curing of the foundation block for achieving the desired strength. fabrication, and fixing/ bolting of 2 nos. vertical columns (ms pillars) of 3.65m height by using ismc 150 ( 2 nos. each for one pillar with batten plates of thickness 8/10mm, foundation plates of size (400x400x12mm) and top plates of suitable size which shall be welded with
Sector: Water supply and Sewerage