Details: dismantling aluminum / gypsum partitions, oors, windows, fixed glazing and false ceiling including disposal of unserviceable surplus material and stacking of serviceable material within 50 meters lead as directed by engineer-in-charge. providing laminated veneer lumber conforming to is. 14616 and tad-15: 2001 (part b) in factory made frames of doors, windows, clerestory windows and other frames wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately). providing and fixing panelled or panelled and glazed shutters for doors,windows and clerestory windows fixing with hinges of required size withnecessary screws, excluding panelling which will be paid for separately, all complete as per direction of engineer-in-charge. (note: - hinges and necessary screws shall be paid separately). first class kail wood providing and fixing panelling or panelling and glazing in panelle
Sector: PWD