Details: demolishing r.c.c. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge. dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge:2. bituminous road. earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including dewatering, construction of ring bund, dressing of sides and disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.1. all kinds of soil : earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including dewatering, construction of ring bund, dressing of sides and disposal of excavated earth lead upto 50 meters and lif
Sector: Urban Authority