Details: providing & fixing of iron tree guards of 17 kgs weight + 10% iron oxide coated (as per the design available in the divisional office) carriage of 100 tree guards upto site over an average lead of 2-3 kms earth work in excavation and disposal of excavated earth upto 01 meter, for fixing of 100 tree guards each in 4 blocks of size 1.5'x1.5'x1.5' and planting of 100 plants in pits of size 1.5'x1.5'x1.5' and disposed earth to be leveled and dressed (in all kinds of soil) cost/carriage of good earth (1cft) & humus (2cft) & carriage of mixed material upto site for 100 plants cost/carriage of 100 no's of flowering ornamental plants (height 3ft and above) filling of mixed earth/humus mixture in 100 pits of size 1.5'x1.5'x1.5' not exceeding 20 cm in depth and consolidating each deposited by ramming. providing/laying in position cement concrete 1:2:4 mix (including carriage charges of material) for fixing of 100 tree guards each in 4 concrete
Sector: Forest and Environment