Details: road work (a) surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto 1.5 m in -all kinds of soil. providing and laying of khak bajri/nallah mukh including spreading, watering, ramming, compacting with prr of 8 to 10 tonne capacity including carriage of the same from approved source upto site of work complete. supplying and stacking at site graded crushed stone aggregate of size 63 mm to 45 mm supplying and stacking at site stone screening of 13.2 mm nominal size. supplying and stacking at site moorum laying, spreading and compacting stone aggregate of specified sizes to wbm specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density carr
Sector: PWD