Details: demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) demolishing r.c.c. work manually/by mechanical means includingstacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by engineer-in-charge.all kinds of soil : earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of
Sector: Urban Authority