Details: engagement of labourers for clearance of site etc. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in charge. (a) all kinds of soil removal of mulba / unhygenic material / mud from the site including its d
Sector: Urban Authority