Details: maintenance of 10800 saplings in identified nh stretches total length of approx. 11.44 kilometer on rhs/lhs of nh-74 in haridwar to nagina sections at different stretches including application of fully dried fym (@ 5 kg/pit), irrigation (10 litre/pit/plant) 04 application up to march, 2025 and 02 operations control, pruning, fertilizer and general maintenance up to march, 2025 detail as under as per the scope of work watch and ward for of 10800 saplings in identified nh stretches total length of approx. 11.650 kilometer on rhs/lhs of nh-74 in haridwar to nagina section gap filling work of about 5400 mulberry saplings (pit making & transplantation) as per the requirement in identified nh stretches on rhs/lhs of nh-74 in haridwar to nagina section
Sector: Sericulture