Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. (hsr 5.7)5.7.4 - in cement mortar dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by engineer-in-charge. (hsr 5.49) supply & fixing windows frames (chowkhats) including mullions consisting frame fabricated from sheet roll formed out of 1.2mm thick galvanized sheet as per is:277 (base steel as per is 513) with zinc of 120 gm/sqm & powder coated with pure polyester powder up to 50 microns (as per approved colour), 3 nos. 100mm - hinges 2mm thick, 6 nos. 1.2mm thick crca electroplated stiffner, 6 nos. m.s hold fast with split and tail welded to stiffner plate 200mm long, receiver for aldrop, weld less corner assembly with brackets & scre
Sector: General Admin