Details: [10.8]providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [13.29.1]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 1. in stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete [13.30.1]steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. hot finished welded type tubes [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excava
Sector: General Admin