Description: Name of Work Supply Dismantling fitting and commissioning of planetary drives along with all accessories in all respect Make APEX DYNAMICS KAVITSU BONFIGLIOLI
Details: Supply, Dismantling, fitting and commissioning of planetary drives along with all accessories in all respect. (Make- APEX DYNAMICS/KAVITSU/BONFIGLIOLI).: Supply, Dismantling, fitting and commissioning of planetary drives along with all accessories in all respect (Make- APEX DYNAMICS/KAVITSU/BONFIGLIOLI):- (i) Crystallizer No. – 2 – Duty- A-M/C, Capacity in ton- 50, Shaft size in mm- 135, RPM – 1.0 (ii) Crystallizer No. – 4 – Duty- A-M/C, Capacity in ton- 50, Shaft size in mm- 180, RPM – 1.0 (iii) Dry Seed Crystallizer – Duty- Dry Seed, Capacity in ton- 30, Shaft size in mm- 139, RPM – 1.0 (iv) Vacuum Crystallizer – Duty- A-M/C, Capacity in ton- 50, Shaft size in mm- 150, RPM – 1.0
Sector: Urban Authority