Description: Provision of MS grill in ground floor balconies of 05 Nos Hostel blocks at CUH Name of Work Provision of MS grill in ground floor balconies of 05 Nos Hostel Blocks at CUH
Details: Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Providing and fixing carbon steel galvanised ( minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 mm dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. as per direction of Engineer-in-charge.10 x 80 mm Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Sector: University