Description: Providing 37 5 MLD MPS and 15 MLD STP based on SBR technology with tertiary treatment for 15 MLD flow including transformer DG Set etc construction of STP in Sector 14P II Hisar Construction of main entrance gate and wicket gate and providing a Name of WorkProviding 37 5 MLD MPS and 15 MLD STP based on SBR technology with tertiary treatment for 15 MLD flow including transformer D G Set etc construction of STP in Sector 14P II Hisar Construction of main entrance gate wicket gate and providing fixingadvance direction sign board in Sewerage Treatment Plant Sector 14P II Hisar complete in all respect and all other works contingency thereto Including one year mtc and defect liability period free of cost A C Rs 1 98 Lacs
Details: 4.12 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge.4.12.1 All kinds of soil. 10.100 Cement Concrete 1:8:16 Flooring10.100.2 Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. 7.21 Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in:7.21.1 Cement mortar 1:4 (1 cement: 4 coarse sand) 7.22 Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in :7.22.1 Cement mortar 1:4 (1 cement: 4 coarse sand) 6.9 Providing and laying damp-proof course with cement concrete1: 1.5:3 (1 cement : 1.5 coarse sand (zone-Ill): 3 graded stone aggregate 20mm nominal size)6.9.2 40mm thick
Sector: Urban Authority