Details: hsr item 17.5.3-compacting original ground 3. compaction of earthworkcompaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specificationshsr rate(rs.) 7.00 through rate hsr item 17.22.2-water bound macadam gr i 2. water bound macadam grading i with screening type a providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering andcompacting to the required density complete as per technical
Sector: General Admin