Details: extra excavatopn work for driven pit/intermediate pit/exit pit required for pushing, pulling of hdpe pipe as per direction of engineer-in-charge. providing,laying ,jointing,pushing 315mm dia hdpe pipe,complete in all respect as per direction of engineer-in-charge. providing,laying ,jointing,pushing 400mm dia hdpe pipe,complete in all respect as per direction of engineer-in-charge. construction of castin situ r.c.c depth (6.0-6.29) manhole 2100mm,complete in all respect, as per dirction of engineer-in-charge. construction of castin situ r.c.c depth (4.50-4.79) manhole 1500mm,complete in all respect, as per dirction of engineer-in-charge.
Sector: General Admin