Details: ns item water treatment plant (wtp) - designing, testing, construction and commissioning of 0.50 mld capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of di pipes from raw water pump to inlet box of wtp, wtp to cwt and suction well for cw including, di specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved nit. (sluice valve of make ivcawag). operation and maintenance for complete scope of work mentioned in dnit i.e water works (disinfection material will be supplied by phed) as per schedule-iv for a period of 5 year after 12 month`s
Sector: General Admin