Details: design, construction, supply, installation, testing and commissioning of 30 mld sewage treatment plant (stp) at rathdhana, sonipat on sbr with advanced biological nutrient removal technology along with 18 mld ultra filtration (uf) based tertiary treatment plant (ttp) including one year defect liability period and all other required associated works as per scope, specifications and conditions mentioned in tender document on turnkey and lump sum basis.
Sector: General Admin