Details: [1.pm055] pm055. hire charges for jcb with bucket capacity of 0.4 with fuel and driver [17.6]construction of embankment with material obtained from borrow pits na construction of embankment cbr 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2, as per technical clause 305 of mort&h specifications. [6.1.2]providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size)
Sector: Urban Authority