Details: [17.5.3]compacting original ground 3. compaction of earthwork compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specifications [through rate] [17.6]construction of embankment with material obtained from borrow pits na construction of embankment cbr 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2, as per technical clause 305 of mort&h specifications. [through rate] [17.14.2]granular sub-base with close graded material - (table:- 400-1) plant mix method construction of granular sub-base by providing material as p
Sector: Urban Authority