Details: supply of cement solvent providing and fixing of 6 kw electric meter connection with 3 phase energy meter from dhbvn at site in favour of mcf including i.e. connection security, file process charge, connection charge, inspection fee, test report fee, other expenses and installation of 1 no. approved energy meter landt make with 2 kva capacitor and required cable. supply of pvc pipe 4” 6kg pressure. pvc bend 100mm .. supply of pvc tee 4”x 4” x 4” isi mark making connection with existing line.. supplying, , testing and commissioning of submersible pumping sets as per bis specification no. 8034-1989 (as amended upto date for pumps) and is 9283-1979 (as amended upto date for motor) the pump motor sets should be capable of pumping clear fresh cold water having characteristics as specified in clause-4 of is 8034-1989 and clause 4.1 of is 9283-1979.7.5hp
Sector: General Admin