Details: [13.30.1]steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. hot finished welded type tubes [through rate] [3.1.18]by mechanical transport including loading, unloading and stacking 18. disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of engineer-in-charge. [rate] [3.1.2]by mechanical transport including loading, unloading and stacking 2. earth [5km] [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bot
Sector: General Admin