Details: [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) [through rate] [21.95.2]providing lowering cutting jointing and testing rcc pipe class np3 as per is-458-2003 with spigot and socketed joints manufactured with isi marked sulphate resistance cement as per isi 12330 with rubber rings isi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a unifor
Sector: General Admin