Details: [3.1.1]by mechanical transport including loading, unloading and stacking 1. lime, moorum, building [5km] [4.12.1]earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer-in-charge. 1. all kinds of soil [through rate] [5.23.2]demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. 2. nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [through rate] [5.7.4]demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. 4. in cement mortar [through rate] [6.1.8]providing and laying in position cement concrete of specified grade e
Sector: General Admin