Details: [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [11.68.3]applying priming coat: 3. with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [through rate] [11.78]painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [through rate] [13.29.2]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [through rate] [21.2.2]dismantling existing drains of different sizes cunnettes, section only including recovery of all useable materials, stacking the same near site of dismantled works and disposal of all
Sector: General Admin