Details: [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [10.8]providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [through rate] [13.29.2]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [through rate] [17.6]construction of embankment with material obtained from borrow pits na construction of embankment cbr 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2, as per technical clause 305 of mort&h specifications. [through rate] [17.69.2]interlockin
Sector: General Admin