Details: [11.78]painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [through rate] [17.70]removal of existing ipb by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [through rate] [26.347]providing and stacking of alstonia scholaris of height 150-165 cm. in bag of size 25 cm as per direction of the officer-in-charge. [through rate] [26.370]providing and stacking of ficus benjamina (green) of height 150-165 cm., bushy with healthy branches and lush green foliage in 35 cm hdpe bags as per direction of the officer-in- charge. [through rate] [26.447]providing and stacking of chandni dwarf of height 15-20 cm., well branched in earthen pots of size 15 cm as per direction of the officer-in-charge as per direction of the officer-in-charge. [through rate] [26.485]providing and stacking of nerium oleander variegated of h
Sector: General Admin