Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer-in-charge, all kinds of soil (hsr 4.12.1) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level, 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) (hsr 6.1.8) brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in:cement mortar 1:6 (1 cement: 6 coarse sand) (hsr 7.21.2) brick work with common burnt clay non-modular bricks of class designation 7 .5 in superstructure above plinth level up to floor iv level in all shapes and sizes in :cement mortar 1:4 (1 cement: 4 coarse sand) (hsr 7.22.1) providing and laying in position cem
Sector: General Admin