Details: [11.25.1]pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. flush / ruled/ struck or weathered pointing [through rate] [16.27]filling cement bags with sand, sewing and laying in position within 30 metres in water including cost of strings by mechanical/ mannual means. [through rate] [21.95.1]providing lowering cutting jointing and testing rcc pipe class np3 as per is-458-2003 with spigot and socketed joints manufactured with isi marked sulphate resistance cement as per isi 12330 with rubber rings isi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket j
Sector: General Admin