Description: Annual Maintenance Estimate for Water Supply and Sewerage Scheme in Sector 13 Bhiwani Sector 13 EWS HBC for the year 2024 2025 Name of Work Annual Maintenance Estimate for Water Supply and Sewerage Scheme in Sector 13 Bhiwani Sector 13 EWS HBC for the year 2024 2025 FOR THE YEAR 2024 2025 Cleaning of drain and removing of rank vegetation and clearing of drain path from 10MLD STP to Bhiwani jind Highway NH 709 A and all other works contingent thereto A c Rs 1 97 392
Details: [26.4.2]SITE CLEARANCE 2. Surface dressing of ground including removing rank vegetation and inequalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m in all kind of soils . [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. [4.13.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge 1. Ordinary rock
Sector: Urban Authority