Details: [26.4.3]site clearance 3. clearing jungle manually including uprooting rank vegetation , grass, vegetation up to 30cm girth measured at height 1 m above ground level and removal of up to a distance of 50 m out side the periphery of the area cleared [through rate] [3.1.18]by mechanical transport including loading, unloading and stacking 18. disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of engineer-in-charge. [rate]
Sector: Urban Authority