Details: 21.96.2-providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths isi marked hdpe pipe of pe-80 grade and pn- 4 for sewer application as per is 14333-1996 (amended up to date) in trenches in complete including cost of hdpe specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per technical specifications and as per direction of engineer. note: e/w to be measured and paid separately. rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 2. 225 mm outside dia 4.12.1-earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer in-charge. 1. all kinds of soil 6.16-reinforced cement concrete work in beams,
Sector: Urban Authority