Details: 4.1:- clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. [through rate] 17.5.1:- compacting original ground 1. compacting original ground below road crust loosening of the ground up to a level of 500 mm below the road crust, watered, graded and compacted at omc inlayers to meet requirement of table 300-2 for embankment construction as per technical clause 305 of mort&h specifications [through rate] 17.5.3:- compacting original ground 3. compaction of earthwork compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specificat
Sector: Urban Authority