Details: 4.12.1:- earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer-in-charge. 1 all kinds of soil 17.5.3:- compacting original ground 3. compaction of earthwork compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specifications [through rate] 17.15.1:- granular sub-base with coarse graded material - grading-i or ii or iii (table:- 400-2) construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place meth
Sector: Urban Authority