Details: [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [through rate] [11.93.1]finishing walls with water proofing cement paint of required shade : 1. new work (two or more coats applied @ 3.84 kg/10 sqm) [through rate] [14.51.1]hire charges for hydraulic excavator/loader like jcb/pock lain, hitachi etc with all accessories having bucket capacity 1. hire charges forjcb with bucket capacity of 0.4 [through rate] [17.8.1]compaction 1. extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling [through rate] [2.rm079] rm079. earth cost or compensation for earth taken from private land [rate] [26.4.3]site clearance 3. clearing jungle manually including uprooting rank vegetation , grass, vegetation up to 30cm girth measured at he
Sector: Urban Authority