Details: 4.12.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by engineer-in-charge. all kinds of soil. 10.100.2 cement concrete 1:8:16 with over burnt (jhama) brick aggregate: 40 mm size in foundation and plinth. 7.22.1:- brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure: cement mortar. 1:4 (1 cement: 4 coarse sand) 11.5.3 12 mm cement plaster of mix : 1 :4 (1 cement: 4 fine sand) 6.33.3steel reinforcement for r.c.c. work, where not included in the complete rate of rcc, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level cold twisted bars. 6.14.2providing and laying in po
Sector: Urban Authority