Details: supplying and stacking at site of work well-decayed farm-yard manure from any available source, approved by the engineer-incharge including screening through sieve of ls.designation 16 mm with 5 km lead. (hsr 26.1) supply of well brunt cylindrical earthen pots of 25 cm size of pots filled to full volume with mixture of good earth & mixture in the ratio of 2:1 (two part of good earth & one part of manure) and placing them on appropriate place i/c carriage of eartt,manure and pots up to 50 mtrs as per direction of officer in charge (hsr 26.38.3) providing circular /square cement concrete pots of cement pots size 35 cm x35 cm, cast with cement concrete of nominal mix 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 6 mm nominal size), including required from work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows and height, all complete as per direction of officer-in-charge. filling 2/3rd volume with mixture of good earth an
Sector: General Admin