Details: hsr item [4.41]earth work of silt-clearance of channels and drains. kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. hsr item [4.2]clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared.
Sector: General Admin