Details: dewatering of waste water from pond / nalla ordepression area complete in all respect as per satisfaction to engineer in charge rates analysis of earth filling with a lead of 10 k.m.including loading unloading and shifting complete analysis for house water connection damagedduring construction of street nalla and drain complete including pipe clamp etc
Sector: General Admin