Details: TFR work 10.952 Tkm in the section of SSE/PTA. Replacement of any type of sleepers in track withPSC sleepers lying on cess or at Bridge Approachesfor casual renewal at isolated locations with allfittings complete to specified gauge & cross levelwith contractor's tools including packing anddressing of ballast, as directed by Engineer incharge. Released materials shall be neatly stackedand handed over at specified location within anaverage lead of 250 m or near either side of Bridgeapproaches as directed.
Sector: Railways