Details: [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [13.29.2]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [through rate] [21.2.3]dismantling existing drains of different sizes cunnettes, section only including recovery of all useable materials, stacking the same near site of dismantled works and disposal of all off site of works. 3. type ii drain [through rate] [3.1.1]by mechanical transport including loading, unloading and stacking 1. lime, moorum, building [5km] [3.1.2]by mechanical transport including loading, unloading and stacking 2. earth [5km] [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenche
Sector: General Admin