Details: material required- mechanical and electrical works, detail given below.supply and fixing of 2½” pump g.i. new making with supply and fixing of 2½” ms clamp hd supply and fixing of panel box hut supply and fixing of 4” tee (4”x4”x4” c.i. tee) isi 4” duck foot bend c.i. isi 4” ci bend isi 4” vertical pipe with 4” horizontal pipe with labour charge for making tee connection with existing line excavation, cutting, jointing and making and making connection with existing line complete in all respects add cost of connection charges for 1 nos. electric connection to be deposit with dhbvn (load 10 hp 8 kw) (security, meter cost, meter testing, 25mm square x3 core aluminum cable etc. complete).
Sector: General Admin