Details: repair of water connection at site including material and labour charges, complete in all respect cleaning of storm water drains of 300mm dia including pipeline, removal of existing pipeline and relaying same after cleaning of pipeline and disposal of malba 5km, away including maintenance complete to the entire satisfaction of the engineer-in-charge. cleaning of road gully/manhole i/c removal of slav and relaying of slab after cleaning of road gully/manhole complete all respect to the entire satisfaction of engineer-in-charge.
Sector: General Admin