Details: [10.1.1.1]providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. 1.1. re-compacting excavated soil in plinth under floors, including watering, ramming, consolidating and dressing complete. [through rate] [10.100.2]cement concrete 1:8:16 flooring 2. cement concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [through rate] [17.70]removal of existing ipb by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [through rate] [2.b0051] b0051. 80 mm thick interlocking paver blocks (m-35) [rate] [2.b1037] b1037. concealed zinc coated hinges 19-20 mm thick with mounting plate [rate] [23.7.6.2]pvc conduit pipe only (surface or recessed) for electrical points 6.2. supply and of pvc conduit isi marked (medium) recessed in wall/ceiling etc. including the cost of pvc bends, inspection boxes, iron hooks and cement concrete etc. complete in
Sector: General Admin