Details: [17.70]removal of existing ipb by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [through rate] [2.b2008] b2008. pvc blind pipe 200 mm dia as per is: 12818 [rate] [22.205.1]constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast r.c.c. horizontal grating with frame complete as per standard design : 1. with common burnt clay non-modular bricks of class designation 7.5 [through rate] [3.1.18]by mechanical transport including loading, unloading and stacking 18. disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of engineer-in-charge. [rate] [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual mea
Sector: General Admin