Details: [17.5.3]compacting original ground 3. compaction of earthwork compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specifications [4.14.1]earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. all kinds of soil. [6.1.4]providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level: 4. 1:3:6 (1 cement : 3 coarse sand
Sector: General Admin