Details: [10.8]providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [17.13]granular sub-base (mix in place) construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of mort&h technical specifications [17.69.2]interlocking concrete block pavement 2. providing and laying 80 mm thick isi marked interlocking paver blocks conforming to is 15658:2006/irc sp 63: 2004 of all shapes and colours in design mix cement m 40 over the bed of 30 mm thick fine sand complete in all respect. [17.8.1]compaction 1. extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling [17.8.2]compaction 2. extra for watering the earth/fly ash laid in 20 cm layers as per specifications [17.8.3]compaction 3. extra for ro
Sector: General Admin