Details: kamboj sudhar sahba tender [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [through rate] [6.1.1]providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level: 1. 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size) [through rate] [6.33.3]steel reinforcement for r.c.c. work, where not included in the complete rate of rcc, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level note: reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & plac
Sector: General Admin