Details: [10.8]providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [17.22.1]water bound macadam gr i 1. water bound macadam grading i (without screenings for low volume roads (undesignated) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of mort&h specifications [17.6]construction of embankment with material obtained from borrow pits na construction of embankment cbr 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grad
Sector: General Admin