Details: a/mtc of ephs in sector-13, urban estate, kurukshetra. `rising of manhole, construction ofmanhole and laying of sw pipe line 200mm dia complete in all respect.` [11.11.1]12 mm cement plaster finished with a floatingcoat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand)[through rate]38.85 sqm2. [21.94.3]providing salt glazed stone ware pipes grade ‘a’ in standard length of 600 mm each pipe marked with is:651 and their lowering, cutting, jointing and testing asdescribed in item no. 21.38, 21.39, item 21.40 includingthe cost of jointing materials as well as carriage, loading,unloading, stacking, handling, re-handling etc. complete inall respects to the satisfaction of engineer-in-charge. 3.200mm i/d [through rate]82.00 per mtr.3. [4.12.1]earth work in excavation by mechanical means(hydraulic excavator)/manual means over areas (exceeding30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth leadup to 50 m and lift up to 1.5 m, as
Sector: Urban Authority